Construction Of A New Crossing System For Category A At Km 20.831 On Railway Lines No. 17 And 25, Operated From A Distance From Km 22.005 To Railway Line No. 17 And At Km 25.355 For Category B On Railway Line No. 17 Along With Connections In Station Facilities